Perpustakaan Institut Teknologi Padang

  • Beranda
  • Informasi
  • Berita
  • Bantuan
  • Pustakawan
  • Area Anggota
  • Pilih Bahasa :
    Bahasa Arab Bahasa Bengal Bahasa Brazil Portugis Bahasa Inggris Bahasa Spanyol Bahasa Jerman Bahasa Indonesia Bahasa Jepang Bahasa Melayu Bahasa Persia Bahasa Rusia Bahasa Thailand Bahasa Turki Bahasa Urdu

Pencarian berdasarkan :

SEMUA Pengarang Subjek ISBN/ISSN Pencarian Spesifik

Pencarian terakhir:

{{tmpObj[k].text}}
Image of Analisis Perencanaan Bangunan Talang Beton dengan Panjang 18 Meter pada Daerah Kabupaten Solok
Penanda Bagikan

Text

Analisis Perencanaan Bangunan Talang Beton dengan Panjang 18 Meter pada Daerah Kabupaten Solok

Mutia Agma Syafitri - Nama Orang;

ABSTRACT

Planning for concrete gutters is a component that is needed to drain water to rice fields, fields and other agriculture. The purpose of planning a concrete gutter building is to drain water regularly according to plant needs when the groundwater supply is not sufficient to support plants, so plants grow normally. Provision of irrigation in accordance with the needs of the plants needed. The source of irrigation water for the Solok area comes from Rambah Samo, Pasar Tangon station and Lubuk Bendahara station and has two primary channels, namely the right primary channel and the left primary channel. the study is only in the Solok irrigation area on the right. Designing the planning dimensions of gutters. water needs in the Banda Lawch area, Solok Regency. If the results of this feasibility study recommend «feasible to build», then this final report can be used by the Solok Regency Government as a development priority in realizing food strengthening and security as well as making a significant contribution to improving people's living standards. For Penman-Modification, it is enough to use the average temperature. The yellow column represents the rainfall that will be used for calculating plant water needs, with the formula, so that ranking 3 is obtained, namely in 2000. According to the manual calculation of KP 01, the average rainfall is multiplied by 70% for planning plant water needs. The data used is rainfall data of R80 per month. Evapotranspiration can be calculated from climate parameters obtained from weather data, coordinates, and altitude. The Penman-Monteith method is the closest approach to the results in the field. Find the rate of evaporation Percolation P 2 mm/day. Land preparation period T 45 days Water required for saturation is added by 50 mm. So for the flow rate (Q) it is taken 0.50-1.50 (m3/s) and for the guard height (F) is taken 0.50 m as the guard height and so b 2.65 while h1 1.68 m. For the calculation of the dimensions of the channel, the plan is used to be 1.38 m, while for the bottom width of the channel b is used to be 1.65 m, the minimum channel speed is 0.25 m/s, the minimum base width (b) is 0.30 m, and the guard height channel is 0.50 m, thickness of concrete (T1) is used 0.3 m, thickness of concrete (T2) is used 0.2 m and 1 tm of water is used. The length of the concrete gutter span is 18 m with the thickness of concrete thick concrete (T1) is used 0.3 m and the thickness of concrete (T2) is used 0.2 m with concrete quality fe' 20 Mpa, shear reinforcement fy is used 240 Mpa, main reinforcement fy is used 390 MPa. The flexural reinforcement of the square T-beam has a k value of 0.413, the reinforcement ratio is 0.043366, max = 0.01684, min = 0.00583 so it is necessary to use. The reinforcement used is D19 reinforcement, and 18 pieces of tensile reinforcement with a distance of 5.5 cm, 9 pieces of compressive reinforcement of 50% of As are made into 10 pieces with a distance of 55 cm of reinforcement, 20% of side reinforcement is taken from As many as 9 pieces made into 10 pieces with the distance of reinforcement is 55 mm, while for hoop reinforcement for beams T Vu = 651542.40 N.mm, Vc = 0.75 7364.30 651542.40. Since 1/2 Vc < Vu, stirrup reinforcement is required. The distance of hoop reinforcement is 7.026 mm^2 for floor plate hoop reinforcement and Vu = 651542.40 N.mm, Vc = 0.75.7364.30> 651542.40. Since 1/2 Vc < Vu, stirrup reinforcement is required. The hoop spacing is 7,026 mm^2 for the upright plate hoop reinforcement.

Keywords: irrigation, water requirements, irrigation planning standards, channel dimensions.


Ketersediaan
#
Perpustakaan ITP (karya ilmiah 1) 2221-012
2221-012
Tersedia - Available
Informasi Detail
Judul Seri
Tugas Akhir Teknik Sipil Sarjana
No. Panggil
2221-012
Penerbit
Padang : Fakultas Teknik ITP., 2022
Deskripsi Fisik
-
Bahasa
Indonesia
ISBN/ISSN
2017210066
Klasifikasi
NONE
Tipe Isi
text
Tipe Media
computer
Tipe Pembawa
-
Edisi
-
Subjek
-
Info Detail Spesifik
-
Pernyataan Tanggungjawab
Mutia Agma Syafitri
Informasi Lainnya
NIM
-
Versi lain/terkait

Tidak tersedia versi lain

Lampiran Berkas
  • Abstract Mutia Agma Syafitri
  • Harap masuk untuk melihat lampiran
Komentar

Anda harus masuk sebelum memberikan komentar

Perpustakaan Institut Teknologi Padang
  • Informasi
  • Layanan
  • Pustakawan
  • Area Anggota

Tentang Kami

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Cari

masukkan satu atau lebih kata kunci dari judul, pengarang, atau subjek

Donasi untuk SLiMS Kontribusi untuk SLiMS?

© 2026 — Senayan Developer Community

Ditenagai oleh SLiMS
Pilih subjek yang menarik bagi Anda
  • Karya Umum
  • Filsafat
  • Agama
  • Ilmu-ilmu Sosial
  • Bahasa
  • Ilmu-ilmu Murni
  • Ilmu-ilmu Terapan
  • Kesenian, Hiburan, dan Olahraga
  • Kesusastraan
  • Geografi dan Sejarah
Icons made by Freepik from www.flaticon.com
Pencarian Spesifik
Kemana ingin Anda bagikan?