Analisis Produktivitas Tenaga Kerja Pembangunan Perumahan Parak Karakah Regency Type 50 Kota Padang Sumatera Barat
ABSTRACT
The study was conducted by observing the workforce in a 1-story house using the Time and Motion Study Method where this method is useful for knowing the activi ties carried out by the workforce in completing a job during working hours, both effec tive time and ineffective time in the field. The study was conducted for 3 days on the work of installing red brick walls brick and 3 days on the work of plastering. The value of the labor coefficient obtained for the work of installing red brick brick walls in this study is the coefficient value for workers 0.0306 OH and the coefficient value for build ers is 0.0714 OH, while for plastering work the coefficient value for workers is 0.0636 OH and the value of the coefficient on the craftsman 0.0650 OH. Where the ratio of the ratio of coefficient values in the field to workers is 89,63% less than the coefficient val ue in the Minister of Public Works and Public Housing No. 28 of 2016 and the coeffi cient value in the field for builders is 28.68% less than the coefficient value in the PUPR Ministerial Regulation No. 28 of 2016 for the work of installing brick red brick walls. Meanwhile, the ratio of the ratio of the coefficients in the field to workers is 80,79% less than the coefficient values in the Minister of Public Works and Public Housing No. 28 of 2016 and the coefficient value in the field for craftsmen is 57,16% less than the coefficient value in the PUPR Ministerial Regulation No. 28 of 2016 for plastering work.
Keywords: labor, productivity, coefficient, working time, effective time, ineffective time.
Tidak tersedia versi lain